IN National Ganga River Basin Project
Sector: Water Supply and Storage • Location: India
Source: World Bank Group
The objectives of the National Ganga River Basin Project for India are to support the National Ganga River Basin Authority (NGRBA) in: (a) building capacity of its nascent operational-level institutions, so that they can manage the long-term Ganga clean-up and conservation program; and (b) implementing a diverse set of demonstrative investments for reducing point-source pollution loads in a sustai
- Status
- Closed
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Biomass, Commercial, Waste Processing and Treatment, Government
- Location
- India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about IN National Ganga River Basin Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objectives of the National Ganga River Basin Project for India are to support the National Ganga River Basin Authority (NGRBA) in: (a) building capacity of its nascent operational-level institutions, so that they can manage the long-term Ganga clean-up and conservation program; and (b) implementing a diverse set of demonstrative investments for reducing point-source pollution loads in a sustainable manner, at priority locations on the Ganga. There are two components to the project, the first component being institutional development. The objectives of this component are to build functional capacity of the NGRBA's operational institutions at both the central and state levels, and to provide support to associated institutions for implementing the NGRBA program. Its sub-components include: (i) NGRBA operationalization and program management, (ii) technical assistance for Urban Local Body (ULB) service providers, and (iii) technical assistance for environmental regulators. The second component is the priority infrastructure investments. The objective of this component is to finance demonstrative infrastructure investments to reduce pollution loads in priority locations on the river. The four main sectors of investments are: municipal wastewater management, industrial pollution control, solid waste management and river front management. The investments are intended to exemplify, among other attributes, the high standards of technical preparation and implementation, sustainability of operations, and public participation envisaged in the NGRBA framework. This component will also support innovative pilots, for new and transformative technologies or implementation arrangements. |
Original sector | FY17 - Water, Sanitation and Waste Management |
Budget |
Location
Country | India |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Biomass, Commercial, Waste Processing and Treatment, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in India
- Kiru Hydroelectric Project Jammu and Kashmir India
- Pinnapuram Integrated Renewable Energy Project India
- Chuzachen Hydroelectric Power Project Sikkim
- Mahan I Power Project Madhya Pradesh
- Rampur Hydro Electric Power Project Himachal Pradesh
- UriII Hydroelectric Project Jammu and Kashmir
- Kakrapar Atomic Power Station Expansion
- Nathpa Jhakri India Hydroelectric Power Plant
