logo

In Salah Gas Pipeline, Central Algeria

Sector: Hospital • Location: Algeria

Source: Bechtel

Project
Close

In Salah Gas Pipeline,Bechtel built 330 miles (some 530 kilometers) of natural gas pipeline for a joint venture of BP and Sonatrach Our work comprised  a very-large-diameter pipeline stretching north to south, from Krechba to the national gas distribution hub in Hassi R’Mel, from which Algeria exports the natural gas to European markets, and smaller-diameter lines transporting natural gas directly

Project Information FAQ

Project Information

4 Q
The project “In Salah Gas Pipeline, Central Algeria” is an infrastructure initiative in the Hospital sector, located in Algeria. Taiyo aggregates data on it from Bechtel.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In Salah Gas Pipeline,Bechtel built 330 miles (some 530 kilometers) of natural gas pipeline for a joint venture of BP and Sonatrach Our work comprised  a very-large-diameter pipeline stretching north to south, from Krechba to the national gas distribution hub in Hassi R’Mel, from which Algeria exports the natural gas to European markets, and smaller-diameter lines transporting natural gas directly from the new Reg and Teg fields to Krechba. We completed construction two months ahead of schedule. BP’s project director, Paul Bibby, noted “the sheer determination of the Bechtel construction team to forge ahead and find solutions to every difficulty.” And we managed to work safely (our approach cited within BP as a “best practice”) while finishing ahead of schedule. Image gallery Extremes Algeria, Africa’s leading producer, relies heavily on revenues from the sale of natural gas as well as oil. With this section of pipeline complete, Algeria became—and remains—Europe’s second-largest supplier of natural gas.  We constructed the pipeline using some of the largest chain-type trenching machines in the world. These machines had more than 200,000 steel teeth affixed to rotating chains to cut through the rock. We didn’t use dynamite for reasons of safety and security. The project team dealt with southern Sahara sand dunes as tall as 13 stories and tore through huge deposits of uncommonly hard rock. In the southern portion of the project, high temperatures between June and September averaged some 120 degrees Fahrenheit (49 degrees Celsius). The temperatures, combined with sandstorms made for difficult working conditions.  Especially when moving 177 million square feet (about 5 million cubic meters) of sand. Setting up camp To house our team of 5,000 people, we established five camps along the route. We provided water, electricity, and waste disposal in addition to sleeping quarters, food service and medical facilities.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Medium

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data