In Situ Wastewater Line Renewal Program IDIQ
Sector: Water Supply and Storage • Location: Austin, Texas, United States of America
Source: Dodge USA
The Work generally consists of providing the following services, including but not limited to the rehabilitation of deteriorated wastewater mains and wastewater collection systems using Cured in Place Pipe (CIPP) and the rehabilitation of deteriorated wastewater manholes. This Work will also include designing traffic control and permitting for work in the Right-of-Way.
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Waste Processing and Treatment, Government
- Location
- Austin, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about In Situ Wastewater Line Renewal Program IDIQ
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work generally consists of providing the following services, including but not limited to the rehabilitation of deteriorated wastewater mains and wastewater collection systems using Cured in Place Pipe (CIPP) and the rehabilitation of deteriorated wastewater manholes. This Work will also include designing traffic control and permitting for work in the Right-of-Way. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Austin |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Waste Processing and Treatment, Government |
Article published date | 2024-11-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
