Inch Cape Offshore Wind Farm Geophysical Survey
Under construction · Scotland · Last reported Feb 2025
Source: Offshore-Energy
Geophysical survey operations and a static fishing gear survey are taking place within the Inch Cape offshore wind farm site and its associated export cable corridor from February 19 until the end of April. The survey will assess seafloor conditions and locate boulders or unexploded ordnance (UXO) that need removal before installing cables and wind turbines.
- Status
- Under Construction
- Sector
- Raw Materials, Wind
- Location
- Scotland, United Kingdom
- Updated
- 22 Jul 2026
- Source
- Offshore-Energy
ConstructChat
Ask ConstructChat about Inch Cape Offshore Wind Farm Geophysical Survey
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Geophysical survey operations and a static fishing gear survey are taking place within the Inch Cape offshore wind farm site and its associated export cable corridor from February 19 until the end of April. The survey will assess seafloor conditions and locate boulders or unexploded ordnance (UXO) that need removal before installing cables and wind turbines. |
Original sector | Renewable Energy |
Location
Country | United Kingdom (UK) |
State | Scotland |
Source
Source | Offshore-Energy |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Wind |
Article published date | 2025-03-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
