Increase in capacity of treatment plant
Sector: Water Supply and Storage • Location: Quebec, Canada
Source: Infrastructure Canada
This project involves replacing the current wastewater treatment plant (non-aerated ponds) with a moving bed biofilm reactor with a dissolved air flotation unit, a phosphate removal system, a UV disinfection system and a sludge treatment system. Construction of a new pumping station, along with the installation of the necessary 1.5-km force main, is also planned.
- Status
- Closed
- Sector
- Water Supply and Storage, Nuclear, Fertilizers, Government
- Location
- Quebec, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Increase in capacity of treatment plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project involves replacing the current wastewater treatment plant (non-aerated ponds) with a moving bed biofilm reactor with a dissolved air flotation unit, a phosphate removal system, a UV disinfection system and a sludge treatment system. Construction of a new pumping station, along with the installation of the necessary 1.5-km force main, is also planned. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Quebec |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Nuclear, Fertilizers, Government |
Article published date | 2026-02-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
