logo

Increase the Institutional Capacity in the Field of Nearly Zero Energy Building and E-Mobility Management (INCI NZEB & EMMA)

Sector: Commercial • Location: Hungary

Source: Keep.EU

Project
Closed

According to the EU directive 31/2010 all new public buildings to be built after 31 December 2018, and all new other buildings to be built after 31 December 2020 will need to be nearly zero-energy (NZE) buildings, which means their annual energy dema nd has to be produced by renewable energy resources. This can increase contruction costs by 10-20%. Our objective is to adjust this regulation in a c

Project Information FAQ

Project Information

5 Q
The project “Increase the Institutional Capacity in the Field of Nearly Zero Energy Building and E-Mobility Management (INCI NZEB & EMMA)” is an infrastructure initiative in the Commercial sector, located in Hungary. Taiyo aggregates data on it from Keep.EU.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

According to the EU directive 31/2010 all new public buildings to be built after 31 December 2018, and all new other buildings to be built after 31 December 2020 will need to be nearly zero-energy (NZE) buildings, which means their annual energy dema nd has to be produced by renewable energy resources. This can increase contruction costs by 10-20%. Our objective is to adjust this regulation in a cost effective way by exchanging experiences and increasing the level of the institutional cooperati on. Regarding to the fact that Slovakia and Hungary has the very similar problems and challenges according to the energy politics and the real estate market, we we can define this task as a joint challenge, so much the more that there is no significa nt international cooperation neither zero-energy buildings, nor e-mobility – neither in public, nor in private sector. We give joint answers to the joint questions in our project. After the comparison of the national regulation we create a joint act ion plan which will be made available for the decision makers in both countries. We work out an education material, which makes a proposal for public institutions to the application of the directive. 2 conceptual plans are made as pilot-project: 1 f or new building and one for a renovation, which presents the most cost-effective, most up-to-date technologies. As it is very important to share information, we do a campaign with several pillars. We publish articles on social media, implement a webs ite and establish an info-point. We do trainings and publish a magazine, spreading the information for both public instituions and inhabitants otf the border region.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Medium

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data