logo

Increasing Driver Visibility on the A2 with Road Studs and Markings

Sector: Bridge • Location: London, United Kingdom

Source: Highways Today

Project
Ongoing

When improving safety through visibility was identified as a top priority for planned resurfacing work on three sections of the A2, National Highways selected WJ Group to install high performance road studs and markings. The work resulted in the team battling the elements to ensure that drivers could access this vital length of the network. The A2 is a critical road for both travellers and HGV dri

Project Information FAQ

Project Information

4 Q
The project “Increasing Driver Visibility on the A2 with Road Studs and Markings” is an infrastructure initiative in the Bridge sector, located in London, United Kingdom. Taiyo aggregates data on it from Highways Today.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

When improving safety through visibility was identified as a top priority for planned resurfacing work on three sections of the A2, National Highways selected WJ Group to install high performance road studs and markings. The work resulted in the team battling the elements to ensure that drivers could access this vital length of the network. The A2 is a critical road for both travellers and HGV drivers, connecting London to the port of Dover. Following news that three unlit sections needed to be resurfaced due to low friction levels and worn markings on both the east and west sides of the carriageway, re-establishing visibility on the road was essential. The maintenance works were scheduled to occur on the A2 between Brenley and Boughton, Wincheap and Harbledown, and Nackington and Bridge. In total, 12,000m of road required the necessary repairs to reinstate and further enhance visibility due to the areas not having overhead lighting. During the planning process, National Highways turned to WJ Group for its support in installing the line markings and road studs. With the challenge of creating high visibility for drivers in unlit areas, WJ Group set out to deliver this aim while battling the wet British weather.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data