logo

Increasing Hydroelectric Power Production With The Jaggran II Plant

Sector: Hydro • Location: France

Source: Proparco Groupe AFD (Agence Française de Développement)

Project
Ongoing

The project is simple in its design and has already been tested in the same area with the Jaggran-I project. It consists of: a low-level run-of-the-river dam, with two radial valves to take care of the excess flow during high water periods, an ecological valve for the instream flow and free overflow in case of floods, a water intake at the dam, a water intake tunnel of a 3.85 km length and a diame

Project Information FAQ

Project Information

4 Q
The project “Increasing Hydroelectric Power Production With The Jaggran II Plant” is an infrastructure initiative in the Hydro sector, located in France. Taiyo aggregates data on it from Proparco Groupe AFD (Agence Française de Développement).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project is simple in its design and has already been tested in the same area with the Jaggran-I project. It consists of: a low-level run-of-the-river dam, with two radial valves to take care of the excess flow during high water periods, an ecological valve for the instream flow and free overflow in case of floods, a water intake at the dam, a water intake tunnel of a 3.85 km length and a diameter of 4 m, a surge chamber to avoid "water hammers" (hydraulic overpressure in the event of valves closing downstream), penstocks along a 220 m vertical drop, a hydroelectric surface plant with 4 Pelton turbines of 12 MW each, a mechanism for discharging turbine water into the river downstream, a substation and the necessary transformers, the high-voltage (132 kV) power transmission line for connection to the PESCO (Peshawar Electric Supply Company) grid that serves Muzaffarabad. The project is expected to produce 212 GWh of electricity annually.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data