logo

Ind-Barath Power Gencom Limited

Sector: Power Generation (CCGT) • Location: India

Source: World Bank Group

Project
Active

Ind-Barath Power Gencom Limited (“IBPGL”) developed 126.0 MW coal based power project at Thoothukudi, Tamil Nadu. IBPGL was owned by Ind-Barath Power Infra Private Ltd.(73.9%). The power plant was commissioned in February 2010. Power was sold to PTC India on merchant basis.

The project cost was estimated to be INR 4,924.65 million (US$113.2 million). The project reached financial closure in 200

Project Information FAQ

Project Information

4 Q
The project “Ind-Barath Power Gencom Limited” is an infrastructure initiative in the Power Generation (CCGT) sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Ind-Barath Power Gencom Limited (“IBPGL”) developed 126.0 MW coal based power project at Thoothukudi, Tamil Nadu. IBPGL was owned by Ind-Barath Power Infra Private Ltd.(73.9%). The power plant was commissioned in February 2010. Power was sold to PTC India on merchant basis. The project cost was estimated to be INR 4,924.65 million (US$113.2 million). The project reached financial closure in 2009. The IBPGL Power Project was funded through a combination of equity contributions from our Company and other investors including PTC, and secured and unsecured debt. As of March 31, 2010, the total equity investment made by our Company in IBPGL (for both IBPGL Phase I and IBPGL Phase II) is Rs. 1,581.95 million. We secured financing of Rs. 3,342.70 million for the implementation of the IBPGL Power Project, from a consortium of seven lenders, including IDFC, Indian Overseas Bank, State Bank of India, State Bank of Indore, State Bank of Travancore, Syndicate Bank and Axis Bank. As of March 31, 2010, Rs. 3,145.25 million and Rs. 653.19 million in principal amount of secured and unsecured loans, respectively, remains outstanding. IBPGL added an additional 63.0 MW unit at Thoothukudi, Tamil Nadu, which became operational in July 2010.Tthe total cost of IBGPL Phase II was Rs. 2,356.80 million (US$51.5 million). IBPGL Phase II and funded through a combination of equity contributions from our Company and other investors including PTC and secured debt. As of March 31, 2010, the total equity investment made by our Company in IBPGL (for both IBPGL Phase I and IBPGL Phase II) is Rs. 1,581.95 million. The company secured financing of Rs. 1,100.00 million and U.S.$ 10.00 million for the implementation of IBPGL Phase II from three lenders, UCO Bank, Punjab National Bank and Bank of India.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data