Independence Hike and Bike Trail
Sector: Water Supply and Storage • Location: Frisco, Texas, United States of America
Source: Dodge USA
The project, Independence Hike and Bike Trail, includes but is not limited to, demolition of existing facilities, grading, paving, pedestrian bridges, retaining wall construction, erosion control, signage, temporary irrigation, and landscaping for the 0.50 miles of 12 concrete trail from the alley of Pond Cypress Ln. to the existing bridge located at the Frisco Independence Soccer Fields.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project, Independence Hike and Bike Trail, includes but is not limited to, demolition of existing facilities, grading, paving, pedestrian bridges, retaining wall construction, erosion control, signage, temporary irrigation, and landscaping for the 0.50 miles of 12 concrete trail from the alley of Pond Cypress Ln. to the existing bridge located at the Frisco Independence Soccer Fields. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
