logo

Index-Based Cost Estimation Procedures with Accuracy and Precision Analysis

Sector: Road • Location: Washington, United States of America (USA)

Source: Federal Highway Administration (FHWA)

Project
Completed

This project study investigates the use of construction cost index data in developing project cost estimates, primarily for the engineer's estimate, but also for planning-level estimates. The scope of the study covers various types, sizes, and scopes of transportation projects delivered by State highway agencies. (Although not the focus of this study, the applicability to major projects spanning s

Project Information FAQ

Project Information

4 Q
The project “Index-Based Cost Estimation Procedures with Accuracy and Precision Analysis” is an infrastructure initiative in the Road sector, located in Washington, United States of America (USA). Taiyo aggregates data on it from Federal Highway Administration (FHWA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project study investigates the use of construction cost index data in developing project cost estimates, primarily for the engineer's estimate, but also for planning-level estimates. The scope of the study covers various types, sizes, and scopes of transportation projects delivered by State highway agencies. (Although not the focus of this study, the applicability to major projects spanning several years should be addressed.) The study involves collecting, organizing, and analyzing data from various highway agencies and other facility owners. The research product is guidance for State highway agencies to assist them in determining how best to use cost index data to improve the accuracy and precision of project estimates. Deliverables include meeting summaries, a project work plan, an interim report, a final report, a TechBrief, and a Microsoft PowerPoint presentation.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data