logo
ProjectClosed

India - Chiller Energy Efficiency Project - MP Component

Closed · India

Source: World Bank Group

The objective of the Chiller Energy Efficiency Project (CEEP) for India are to reduce greenhouse gas emissions whilst simultaneously supporting the completion of the phase-out of consumption of ozone depleting substances required under the Montreal Protocol. There are four components to the project. The first component of the project is provision of incentives for investment in energy efficient ch

Status
Closed
Sector
Power Generation (CCGT), Manufacturing (Industrial), Commercial, Government
Location
India
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about India - Chiller Energy Efficiency Project - MP Component

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “India - Chiller Energy Efficiency Project - MP Component” is an infrastructure initiative in the Power Generation (CCGT) sector, located in India. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The objective of the Chiller Energy Efficiency Project (CEEP) for India are to reduce greenhouse gas emissions whilst simultaneously supporting the completion of the phase-out of consumption of ozone depleting substances required under the Montreal Protocol. There are four components to the project. The first component of the project is provision of incentives for investment in energy efficient chillers. In an effort to remove market and techno-economic barriers, the CEEP will provide: (a) chiller owners with either: (i) an upfront financial incentive to subsidize the cost of the replacement of centrifugal chillers before end of technical life; or (ii) an annual payment from a share of certified emission reductions to be generated from the actual energy savings achieved by the new chillers; as well as (b) an incentive for chiller manufacturers, suppliers and energy service companies (ESCOs) to actively participate in the project. The second component of the project is measurement, monitoring and verification. As per the methodology approved by the Clean Development Mechanism (CDM) Executive Board, the CEEP is required to monitor data related to the power-output function of the old chiller to be replaced, electrical consumption of the new chiller, and cooling output in order to measure energy savings and emission reductions achieved. The third component of the project is technical assistance. To support project readiness and sustainability, this component focuses on enhancing the awareness of relevant stakeholders in energy conservation measures, enhancing the understanding of the impact of decision to accelerate the phase-out of production of Chlorofluorocarbon (CFC) on the servicing sector, and strengthening the capacity of chiller owners and other stakeholders to monitor the performance of new chillers and to undertake refrigerant management. The fourth and the final component of the project is project management. A Project Management Unit (PMU) will be established at a financial intermediary - Industrial Development Bank of India (IDBI) - and will be responsible for implementing all activities under the CEEP.

Original sector

FY17 - Energy and Extractives

Budget

Location

Country

India

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Manufacturing (Industrial), Commercial, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project