logo
ProjectApproved

India: Andhra Pradesh 24x7 - Power For All

Sector: Rail • Location: India

Source: Asian Infrastructure Investment Bank (AIIB)

The Project consists of the following components: Component One: Power Transmission System Strengthening This component includes priority investments in 220 kV, 132 kV, 66 kV, and 33 kV lines and associated substations for system augmentation. These investments will reduce overall transmission system losses and increase the transfer capability of the state transmission network. Component Two: Smar

Status
Prospective
Sector
Rail, Power Transmission, Telecommunications, Power Generation (CCGT), Commercial, Government
Location
India
Updated
22 Jul 2026
Source
Asian Infrastructure Investment Bank (AIIB)

ConstructChat

Ask ConstructChat about India: Andhra Pradesh 24x7 - Power For All

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “India: Andhra Pradesh 24x7 - Power For All” is an infrastructure initiative in the Rail sector, located in India. Taiyo aggregates data on it from Asian Infrastructure Investment Bank (AIIB).

Participants

Sponsoring Agency

Status

Original status

approved

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project consists of the following components: Component One: Power Transmission System Strengthening This component includes priority investments in 220 kV, 132 kV, 66 kV, and 33 kV lines and associated substations for system augmentation. These investments will reduce overall transmission system losses and increase the transfer capability of the state transmission network. Component Two: Smart Grid Development in Urban Areas This component would support investments in smart grids and underground cables in selected cities as part of smart cities initiative promoted by GoI. These investments would include smart meters on selected consumers, distribution SCADA, automated sub-stations, and ring main units. It also includes investments on distribution network strengthening and augmentation (33kV and 11kV) in urban areas to meet the growing power demand, reduce technical and commercial losses, improve operational efficiency and increase the system reliability especially in coastal towns prone to natural calamities. Component Three: Distribution System Strengthening-Rural This component would support strengthening and augmentation of the distribution network (33kV and below) and construction of the High Voltage Distribution System (HVDS) in rural areas. The majority of the investments under this component are located in Anantapur and Kurnool. The state of infrastructure in these districts is poor and the majority of power transformers, distribution transformers and feeding lines are overloaded leading to frequent outages and high technical losses. Component Four: Technical Assistance for Institutional Development and Capacity Building This component would improve the project management capabilities and commercial performance of the Andhra Pradesh utilities by (i) Improving ICT systems. (ii) Improving business processes. (iii) Supporting the supervision of contracts through Project Management Consultants, as required. (iv) Building staff capacity through training, workshops and study tours.

Original sector

Energy

Budget

Location

Country

India

Source

Source

Asian Infrastructure Investment Bank (AIIB)

URL

More Details

Record type

Project

Sector

Rail, Power Transmission, Telecommunications, Power Generation (CCGT), Commercial, Government

Article published date

2025-12-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project