India: Assam Electricity Distribution System Enhancement Project

One of 10,000+ projects Taiyo tracks in India.

Source: Asian Infrastructure Investment Bank (AIIB)

The project aims to augment Assam's electricity distribution system, comprising networks at 33Kilo-Volts (KV) level and below, by a) constructing new 33/11KV substations at important load centers, b) laying of new 33KV and 11KV overhead distribution lines, c) installation of new High Voltage Distribution System (HVDS) at select locations to improve reliability and to reduce the distribution losses

Status
Prospective
Sector
Power Generation (CCGT), Rail, Power Transmission, Government
Location
India
Updated
22 Jul 2026
Source
Asian Infrastructure Investment Bank (AIIB)

ConstructChat

Ask ConstructChat about India: Assam Electricity Distribution System Enhancement Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “India: Assam Electricity Distribution System Enhancement Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in India. Taiyo aggregates data on it from Asian Infrastructure Investment Bank (AIIB).

Participants

Sponsoring Agency

Status

Original status

approved

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project aims to augment Assam's electricity distribution system, comprising networks at 33Kilo-Volts (KV) level and below, by a) constructing new 33/11KV substations at important load centers, b) laying of new 33KV and 11KV overhead distribution lines, c) installation of new High Voltage Distribution System (HVDS) at select locations to improve reliability and to reduce the distribution losses, and d) introducing smart meters both at consumer end and at the distribution transformers. The project will consist of the following components:  Component 1: Construction of approximately 196 nos. of 33/11KV substations with the associated 33KV and 11KV distribution lines;  Component 2: Construction of HVDS at around 2,000 locations to replace the existing low voltage network;   Component 3: Installation of approximately 185,000 smart meters for domestic consumers and around 40,000 smart meters at the distribution transformers end; and  Component 4: Technical assistance including a) engaging Project Management Consultants to support project implementation, and b) implementing measures such as trainings, workshops and procurement of new testing tools to improve the capacity of the implementing entity (Assam Power Distribution Company Limited or APDCL).

Original sector

Energy

Budget

Location

Country

India

Source

Source

Asian Infrastructure Investment Bank (AIIB)

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Rail, Power Transmission, Government

Article published date

2024-11-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project