logo
ProjectProposed

India: Assam Intra State Transmission System Enhancement Phase II

Sector: Water Supply and Storage • Location: India

Source: Asian Infrastructure Investment Bank (AIIB)

Assam Electricity Grid Corporation Limited (AEGCL), State of Assam's sole transmission utility, is responsible for the operation, maintenance and development of the transmission system. AEGCL currently operates 82 substations, which includes 1 no. of 400 kV, 14 no. of 220 kV, and 67 no. of 132 kV substations with 9,630 megavolt-ampere (MVA) capacity, and its transmission network comprises 5,395.48

Status
Prospective
Sector
Water Supply and Storage, Government, Residential, Raw Materials, Waste Processing and Treatment, Warehouse, Power Transmission, Manufacturing (Industrial), Power Generation (CCGT), Commercial
Location
India
Updated
22 Jul 2026
Source
Asian Infrastructure Investment Bank (AIIB)

ConstructChat

Ask ConstructChat about India: Assam Intra State Transmission System Enhancement Phase II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “India: Assam Intra State Transmission System Enhancement Phase II” is an infrastructure initiative in the Water Supply and Storage sector, located in India. Taiyo aggregates data on it from Asian Infrastructure Investment Bank (AIIB).

Participants

Sponsoring Agency

Status

Original status

proposed

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Assam Electricity Grid Corporation Limited (AEGCL), State of Assam's sole transmission utility, is responsible for the operation, maintenance and development of the transmission system. AEGCL currently operates 82 substations, which includes 1 no. of 400 kV, 14 no. of 220 kV, and 67 no. of 132 kV substations with 9,630 megavolt-ampere (MVA) capacity, and its transmission network comprises 5,395.486 circuit kilometers (km) of transmission lines of various voltage classes. The project aims to strengthen Assam's electricity transmission system by (a) constructing transmission substations and laying transmission lines with the associated infrastructure; (b) upgrading existing substations, transmission lines and existing ground wire to optical power ground wire; and (c) providing technical assistance to support project implementation. The strengthening program of the transmission system of Assam has been divided into 2 phases, this project constitutes phase 2 of the program. It will construct or upgrade approximately 14 Extra High Voltage (EHV) grid substations along with associated transmission lines and provide technical assistance to support project implementation.

Original sector

Energy

Budget

Location

Country

India

Source

Source

Asian Infrastructure Investment Bank (AIIB)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Residential, Raw Materials, Waste Processing and Treatment, Warehouse, Power Transmission, Manufacturing (Industrial), Power Generation (CCGT), Commercial

Article published date

2024-12-13

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project