logo
ProjectApproved

India: Assam Intra State Transmission System Enhancement Phase II

Sector: Water Supply and Storage • Location: India

Source: Asian Infrastructure Investment Bank (AIIB)

To strengthen the reliability, capacity, and security of Assam's power transmission network, and following a request from the Borrower, AIIB adopted a programmatic approach in 2019. Assam Electricity Grid Corporation Limited (AEGCL), the state's sole transmission utility overseeing the operation, maintenance, and development of Assam's high-voltage power transmission grid, serves as the implementi

Status
Prospective
Sector
Water Supply and Storage, Rail, Power Transmission, Manufacturing (Industrial), Consumer Products, Power Generation (CCGT), Government, Residential, Commercial
Location
India
Updated
22 Jul 2026
Source
Asian Infrastructure Investment Bank (AIIB)

ConstructChat

Ask ConstructChat about India: Assam Intra State Transmission System Enhancement Phase II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “India: Assam Intra State Transmission System Enhancement Phase II” is an infrastructure initiative in the Water Supply and Storage sector, located in India. Taiyo aggregates data on it from Asian Infrastructure Investment Bank (AIIB).

Participants

Sponsoring Agency

Status

Original status

approved

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

To strengthen the reliability, capacity, and security of Assam's power transmission network, and following a request from the Borrower, AIIB adopted a programmatic approach in 2019. Assam Electricity Grid Corporation Limited (AEGCL), the state's sole transmission utility overseeing the operation, maintenance, and development of Assam's high-voltage power transmission grid, serves as the implementing entity for this program.  The first phase of the program, the Assam Intra-State Transmission System Enhancement Project (P000302), was approved in 2021 with AIIB financing of USD 304 million and is currently under implementation. The proposed project constitutes the second and final phase of the program, with planned AIIB financing of USD 140.61 million. This phase aims to further increase the system's transmission capacity, enabling the grid to accommodate higher loads, reduce congestion, and lower the risk of outages. Additionally, the expanded network will facilitate the integration of renewable energy, supporting Assam's clean energy objectives.  Key activities planned under this phase include: Construction of six new high-voltage grid substations with a combined capacity of 870 MVA, along with approximately 128 km of associated transmission lines. Engagement of consultant to support implementation of the project, and capacity building for AEGCL employees through targeted training programs in priority technical areas.

Original sector

Energy

Budget

Location

Country

India

Source

Source

Asian Infrastructure Investment Bank (AIIB)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Rail, Power Transmission, Manufacturing (Industrial), Consumer Products, Power Generation (CCGT), Government, Residential, Commercial

Article published date

2025-12-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project