India: Assam Intra State Transmission System Enhancement Phase II

Sector: Water Supply and Storage • Location: India

Source: Asian Infrastructure Investment Bank (AIIB)

Project
Proposed

To strengthen the reliability, capacity, and security of Assam's power transmission network, and following a request from the Borrower, AIIB adopted a programmatic approach in 2019. Assam Electricity Grid Corporation Limited (AEGCL), the state's sole transmission utility overseeing the operation, maintenance, and development of Assam's high-voltage power transmission grid, serves as the implementi

Project Information FAQ

Project Information

5 Q
The project “India: Assam Intra State Transmission System Enhancement Phase II” is an infrastructure initiative in the Water Supply and Storage sector, located in India. Taiyo aggregates data on it from Asian Infrastructure Investment Bank (AIIB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

proposed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

To strengthen the reliability, capacity, and security of Assam's power transmission network, and following a request from the Borrower, AIIB adopted a programmatic approach in 2019. Assam Electricity Grid Corporation Limited (AEGCL), the state's sole transmission utility overseeing the operation, maintenance, and development of Assam's high-voltage power transmission grid, serves as the implementing entity for this program.  The first phase of the program, the Assam Intra-State Transmission System Enhancement Project (P000302), was approved in 2021 with AIIB financing of USD 304 million and is currently under implementation. The proposed project constitutes the second and final phase of the program, with planned AIIB financing of USD 140.61 million. This phase aims to further increase the system's transmission capacity, enabling the grid to accommodate higher loads, reduce congestion, and lower the risk of outages. Additionally, the expanded network will facilitate the integration of renewable energy, supporting Assam's clean energy objectives.  Key activities planned under this phase include: Construction of six new high-voltage grid substations with a combined capacity of 870 MVA, along with approximately 128 km of associated transmission lines. Engagement of consultant to support implementation of the project, and capacity building for AEGCL employees through targeted training programs in priority technical areas.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data