India: Assam Intra State Transmission System Enhancement Phase II
Sector: Water Supply and Storage • Location: India
Source: Asian Infrastructure Investment Bank (AIIB)
Assam Electricity Grid Corporation Limited (AEGCL), State of Assam's sole transmission utility, is responsible for the operation, maintenance and development of the transmission system. AEGCL currently operates 82 substations, which includes 1 no. of 400 kV, 14 no. of 220 kV, and 67 no. of 132 kV substations with 9,630 megavolt-ampere (MVA) capacity, and its transmission network comprises 5,395.48
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | proposed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Assam Electricity Grid Corporation Limited (AEGCL), State of Assam's sole transmission utility, is responsible for the operation, maintenance and development of the transmission system. AEGCL currently operates 82 substations, which includes 1 no. of 400 kV, 14 no. of 220 kV, and 67 no. of 132 kV substations with 9,630 megavolt-ampere (MVA) capacity, and its transmission network comprises 5,395.486 circuit kilometers (km) of transmission lines of various voltage classes. The project aims to strengthen Assam's electricity transmission system by (a) constructing transmission substations and laying transmission lines with the associated infrastructure; (b) upgrading existing substations, transmission lines and existing ground wire to optical power ground wire; and (c) providing technical assistance to support project implementation. The strengthening program of the transmission system of Assam has been divided into 2 phases, this project constitutes phase 2 of the program. It will construct or upgrade approximately 14 Extra High Voltage (EHV) grid substations along with associated transmission lines and provide technical assistance to support project implementation. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
