India: Assam Intra State Transmission System Enhancement Phase II
Sector: Water Supply and Storage • Location: India
Source: Asian Infrastructure Investment Bank (AIIB)
To strengthen the reliability, capacity, and security of Assam's power transmission network, and following a request from the Borrower, AIIB adopted a programmatic approach in 2019. Assam Electricity Grid Corporation Limited (AEGCL), the state's sole transmission utility overseeing the operation, maintenance, and development of Assam's high-voltage power transmission grid, serves as the implementi
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | approved |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | To strengthen the reliability, capacity, and security of Assam's power transmission network, and following a request from the Borrower, AIIB adopted a programmatic approach in 2019. Assam Electricity Grid Corporation Limited (AEGCL), the state's sole transmission utility overseeing the operation, maintenance, and development of Assam's high-voltage power transmission grid, serves as the implementing entity for this program. The first phase of the program, the Assam Intra-State Transmission System Enhancement Project (P000302), was approved in 2021 with AIIB financing of USD 304 million and is currently under implementation. The proposed project constitutes the second and final phase of the program, with planned AIIB financing of USD 140.61 million. This phase aims to further increase the system's transmission capacity, enabling the grid to accommodate higher loads, reduce congestion, and lower the risk of outages. Additionally, the expanded network will facilitate the integration of renewable energy, supporting Assam's clean energy objectives. Key activities planned under this phase include: Construction of six new high-voltage grid substations with a combined capacity of 870 MVA, along with approximately 128 km of associated transmission lines. Engagement of consultant to support implementation of the project, and capacity building for AEGCL employees through targeted training programs in priority technical areas. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
