Assam Electricity Grid Corporation Limited (AEGCL), State of Assam's sole transmission utility, is responsible for the operation, maintenance and development of the transmission system. AEGCL currently operates 82 substations, which includes 1 no. of 400 kV, 14 no. of 220 kV, and 67 no. of 132 kV substations with 9,630 megavolt-ampere (MVA) capacity, and its transmission network comprises 5,395.48

Project Information FAQ

Project Information

5 Q
The project “India: Assam Intra State Transmission System Enhancement Phase II” is an infrastructure initiative in the Water Supply and Storage sector, located in India. Taiyo aggregates data on it from Asian Infrastructure Investment Bank (AIIB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

proposed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Assam Electricity Grid Corporation Limited (AEGCL), State of Assam's sole transmission utility, is responsible for the operation, maintenance and development of the transmission system. AEGCL currently operates 82 substations, which includes 1 no. of 400 kV, 14 no. of 220 kV, and 67 no. of 132 kV substations with 9,630 megavolt-ampere (MVA) capacity, and its transmission network comprises 5,395.486 circuit kilometers (km) of transmission lines of various voltage classes. The project aims to strengthen Assam's electricity transmission system by (a) constructing transmission substations and laying transmission lines with the associated infrastructure; (b) upgrading existing substations, transmission lines and existing ground wire to optical power ground wire; and (c) providing technical assistance to support project implementation. The strengthening program of the transmission system of Assam has been divided into 2 phases, this project constitutes phase 2 of the program. It will construct or upgrade approximately 14 Extra High Voltage (EHV) grid substations along with associated transmission lines and provide technical assistance to support project implementation.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data