India: Assam Intra-State Transmission System Enhancement Project
Approved · India
Source: Asian Infrastructure Investment Bank (AIIB)
The project aims to strengthen Assam's electricity transmission system by a) constructing new transmission sub-stations and laying new transmission lines with the associated infrastructure, b) upgrading existing substations, transmission lines and existing ground wire to optical power ground wire (OPGW), and c) providing technical assistance to support implementation of the project. The project co
- Status
- Prospective
- Sector
- Power Generation (CCGT), Rail, Power Transmission, Government
- Location
- India
- Updated
- 19 Nov 2026
- Source
- Asian Infrastructure Investment Bank (AIIB)
ConstructChat
Ask ConstructChat about India: Assam Intra-State Transmission System Enhancement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | approved |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The project aims to strengthen Assam's electricity transmission system by a) constructing new transmission sub-stations and laying new transmission lines with the associated infrastructure, b) upgrading existing substations, transmission lines and existing ground wire to optical power ground wire (OPGW), and c) providing technical assistance to support implementation of the project. The project comprises three components: Component 1. Construction of about 10 new high voltage grid substations (400 kV, 220 kV and 132 kV) along with the associated transmission lines. Component 2. Upgradation of a) �about 15 existing substations, b) upgradation of transmission lines to High Tension Low Sag, and c) replacement of existing ground wire by OPGW. Component 3. Technical assistance, including (i) supporting the purchase, installation and operation of an enterprise resource planning system; (ii) engaging a Project Management Consultant to help support implementation of the project; and (iii) organizing training and workshops on project implementation. |
Original sector | Energy |
Budget |
Location
Country | India |
Source
Source | Asian Infrastructure Investment Bank (AIIB) |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Rail, Power Transmission, Government |
Article published date | 2024-10-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in India
- Kiru Hydroelectric Project Jammu and Kashmir India
- Pinnapuram Integrated Renewable Energy Project India
- Chuzachen Hydroelectric Power Project Sikkim
- Mahan I Power Project Madhya Pradesh
- Rampur Hydro Electric Power Project Himachal Pradesh
- UriII Hydroelectric Project Jammu and Kashmir
- Kakrapar Atomic Power Station Expansion
- Nathpa Jhakri India Hydroelectric Power Plant
