logo
ProjectTerminated / Cancelled

India: Ayana Anantapuramu NTPC Solar Project

Terminated / cancelled · India

Source: Asian Infrastructure Investment Bank (AIIB)

The Project involves financing of a 250 MW solar project being developed by a special purpose vehicle, Ayana Ananthapuramu Solar Private Limited (“AASPL” or the “Company” or the “Borrower”). The Project was awarded through a competitive bid, at a tariff of INR 2.73 /kWh (US¢ 3.58/kWh). AASPL signed a 25-year Power Purchase Agreement (“PPA”) with National Thermal Power Corporation (“NTPC”) in July

Status
Failure
Sector
Power Generation (CCGT), Automotive, Geothermal, Solar, Car parking, Government
Location
India
Updated
22 Jul 2026
Source
Asian Infrastructure Investment Bank (AIIB)

ConstructChat

Ask ConstructChat about India: Ayana Anantapuramu NTPC Solar Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “India: Ayana Anantapuramu NTPC Solar Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in India. Taiyo aggregates data on it from Asian Infrastructure Investment Bank (AIIB).

Participants

Sponsoring Agency

Status

Original status

terminated / cancelled

Taiyo status

Failure

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project involves financing of a 250 MW solar project being developed by a special purpose vehicle, Ayana Ananthapuramu Solar Private Limited (“AASPL” or the “Company” or the “Borrower”). The Project was awarded through a competitive bid, at a tariff of INR 2.73 /kWh (US¢ 3.58/kWh). AASPL signed a 25-year Power Purchase Agreement (“PPA”) with National Thermal Power Corporation (“NTPC”) in July 2018. In turn, NTPC signed a 25-year Power Sale Agreement (“PSA”) with AP Discom(s) to sell the electricity generated by the Project to AP Discom(s). As per the PPA, NTPC has the sole obligation to make the payment to AASPL for the power offtake in accordance with the terms of the PPA. Power will be evacuated through the existing, operational 400/220 kV NP Kunta sub-station of PGCIL, which is located at a distance of 3 kms from the solar park in which the Project is being constructed.

Original sector

Energy

Budget

Location

Country

India

Source

Source

Asian Infrastructure Investment Bank (AIIB)

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Automotive, Geothermal, Solar, Car parking, Government

Article published date

2025-12-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project