logo
ProjectApproved

India: ReNew Peak Power Project

Approved · India

Source: aiib

The Project involves providing senior debt project finance facility to ReNew Vyoman Private Limited (Borrower) for the design, construction, commissioning, operation and maintenance of an interstate transmission system (ISTS)-connected wind-solar hybrid peak power supply and round the clock (RTC) renewable energy plant with a contracted 300 MW capacity in the state of Andhra Pradesh, India. The Pr

Status
Prospective
Sector
Road, Energy Storage, Power Generation (CCGT), Solar, Wind
Location
India
Updated
19 Nov 2026
Source
aiib

ConstructChat

Ask ConstructChat about India: ReNew Peak Power Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “India: ReNew Peak Power Project” is an infrastructure initiative in the Road sector, located in India. Taiyo aggregates data on it from aiib.

Participants

Not available for this record.

Status

Original status

approved

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The Project involves providing senior debt project finance facility to ReNew Vyoman Private Limited (Borrower) for the design, construction, commissioning, operation and maintenance of an interstate transmission system (ISTS)-connected wind-solar hybrid peak power supply and round the clock (RTC) renewable energy plant with a contracted 300 MW capacity in the state of Andhra Pradesh, India. The Project will provide assured power supply of 300 MW per hour during the peak hours and a minimum base load supply during non-peak hours. The Project will consist of 250 MW wind capacity, 435 MW AC solar power capacity and 173 MW / 415 MWh battery energy storage system (BESS) (together, the Project). Borrower is ReNew Vyoman Private Limited, the Project Special Purpose Vehicle (SPV). The Sponsor of the Project is ReNew Private Limited, which is the second largest Independent Power Producer (IPP) in India, with a total portfolio of 18.2 GW renewable energy (RE) capacity, out of which 11.1 GW is operational capacity as of August 2025. Offtake of the Project is underpinned by a 25-year Power Purchase Agreement (PPA) signed with Solar Energy Corporation India (SECI) at a fixed tariff of INR4.69 per kWh (USD0.054 per kWh) for the PPA tenor.

Original sector

Energy

Budget

Location

Country

India

Source

Source

aiib

URL

More Details

Record type

Project

Sector

Road, Energy Storage, Power Generation (CCGT), Solar, Wind

Article published date

2026-09-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project