India: West Bengal Major Irrigation and Flood Management
Sector: Water Supply and Storage • Location: India
Source: Asian Infrastructure Investment Bank (AIIB)
The project tentatively consists of the following four components: • Component One: Irrigation Modernization This component aims to reduce operational water losses across the system and allow the available water to service a greater combined area across all crop seasons. The investment would include improving water conveyance and allocation and increasing storage potential and strengthening insti
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Solar, Raw Materials, Fertilizers, Hydro
- Location
- India
- Updated
- 22 Jul 2026
- Source
- Asian Infrastructure Investment Bank (AIIB)
ConstructChat
Ask ConstructChat about India: West Bengal Major Irrigation and Flood Management
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | approved |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project tentatively consists of the following four components: • Component One: Irrigation Modernization This component aims to reduce operational water losses across the system and allow the available water to service a greater combined area across all crop seasons. The investment would include improving water conveyance and allocation and increasing storage potential and strengthening institutions that are responsible for irrigation management. • Component Two: Water Resources Management. This component mainly aims to alleviate annualized flooding in the Lower Damodar sub-basin area. The investment would mitigate flooding hotspots by carrying out channel desilting works, flow regulation structure modification and embankment reconstruction at key locations. In close collaboration with the World Bank-funded Dam Rehabilitation and Improvement Project, the investment would also include measures to strengthen forecasting and analysis capability to improve dam operation and water storage management in upstream reservoirs. Opportunities will also be explored for ways to capture and direct wet season water in order to recharge groundwater. • Component Three: Command Area Development. This component would complement the irrigation system improvement under Component One, with the aim of improving water delivery and allocation below the outlet level (effectively at tertiary command level). The investment would include infrastructure development, capacity strengthening and institutional reforms for improving irrigation at tertiary command level. • Component Four: Project Management and Institutional Development. This component would support strengthening of the capacity for project management of both the IWD and the Project Management Unit , including, inter alia, procurement, financial management and monitoring and evaluation. |
Original sector | Water |
Budget |
Location
Country | India |
Source
Source | Asian Infrastructure Investment Bank (AIIB) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Solar, Raw Materials, Fertilizers, Hydro |
Article published date | 2024-10-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in India
- Kiru Hydroelectric Project Jammu and Kashmir India
- Pinnapuram Integrated Renewable Energy Project India
- Chuzachen Hydroelectric Power Project Sikkim
- Mahan I Power Project Madhya Pradesh
- Rampur Hydro Electric Power Project Himachal Pradesh
- UriII Hydroelectric Project Jammu and Kashmir
- Kakrapar Atomic Power Station Expansion
- Nathpa Jhakri India Hydroelectric Power Plant
