logo

India: West Bengal Major Irrigation and Flood Management

Sector: Water Supply and Storage • Location: India

Source: Asian Infrastructure Investment Bank (AIIB)

Project
Approved

The project tentatively consists of the following four components: • Component One: Irrigation Modernization This component aims to reduce operational water losses across the system and allow the available water to service a greater combined area across all crop seasons. The investment would include improving water conveyance and allocation and increasing storage potential and  strengthening insti

Project Information FAQ

Project Information

5 Q
The project “India: West Bengal Major Irrigation and Flood Management” is an infrastructure initiative in the Water Supply and Storage sector, located in India. Taiyo aggregates data on it from Asian Infrastructure Investment Bank (AIIB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

approved

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project tentatively consists of the following four components: • Component One: Irrigation Modernization This component aims to reduce operational water losses across the system and allow the available water to service a greater combined area across all crop seasons. The investment would include improving water conveyance and allocation and increasing storage potential and  strengthening institutions that are responsible for irrigation management. • Component Two: Water Resources Management. This component mainly aims to alleviate annualized flooding in the Lower Damodar sub-basin area. The investment would mitigate flooding hotspots by carrying out channel desilting works, flow regulation structure modification and embankment reconstruction at key locations. In close collaboration with the World Bank-funded Dam Rehabilitation and Improvement Project, the investment would also include measures to strengthen forecasting and analysis capability to improve dam operation and water storage management in upstream reservoirs. Opportunities will also be explored for ways to capture and direct wet season water in order to recharge groundwater. • Component Three: Command Area Development. This component would complement the irrigation system improvement under Component One, with the aim of improving water delivery and allocation below the outlet level (effectively at tertiary command level). The investment would include infrastructure development, capacity strengthening and institutional reforms for improving irrigation at tertiary command level. • Component Four: Project Management and Institutional Development.  This component would support strengthening of the capacity for project management of both the IWD and the Project Management Unit , including, inter alia, procurement, financial management and monitoring and evaluation.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data