Indian Energy Theni Project Phase 1
Sector: Raw Materials • Location: India
Source: World Bank Group
Indian Energy Theni Project was a 49.5 MW wind farm at Theni in the State of Tamil Nadu. The Theni Project was designed and commissioned in two phases. Phase I consisted of 11 turbines of 1.5 MW capacity each and with a total generating capacity of 16.5 MW. Phase II, consisted of up to 22 turbines of 1.5 MW each and a total capacity of up to 33 MW.
Indian Energy contracted ReGen Powertech Privat
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Indian Energy Theni Project was a 49.5 MW wind farm at Theni in the State of Tamil Nadu. The Theni Project was designed and commissioned in two phases. Phase I consisted of 11 turbines of 1.5 MW capacity each and with a total generating capacity of 16.5 MW. Phase II, consisted of up to 22 turbines of 1.5 MW each and a total capacity of up to 33 MW. Indian Energy contracted ReGen Powertech Private Limited ("ReGen") the construction of the wind farm. ReGen was a Chennai-based company which manufactures turbines using technology from Vensys Energy AG, Germany. Indian Energy entered into a long term 20 year Power Purchase Agreement ("PPA") with the Tamil Nadu Electricity Board for the sale of power at a rate of Rs. 3.39 per kWh as governed by the current State Tariff Order for the first 4.5 MW. The first 4.5 MW of the Theni Project was approved under the Generation Based Incentive Scheme that was announced in December 2009 and was to receive a further INR 0.5 per kWh in revenue. The PPA for the next 12 MW was expected to be signed in 2010. In addition, Indian Energy planned to establish the project as a Clean Development Mechanism under the Kyoto Protocol, which is expected to generate approximately 120,000 Certified Emission Reductions ("CERs") per annum. The project cost of the phase I was estimated to be US$19.8 million, assuming a debt/equity ratio of 75/25. Phase I reached financial closure in April 2010 with (US$14.9 million) INR680 million debt facility from State Bank of India. The first phase was operation by June August 2010. The second phase had a construction scheduled to commence in Q4 2010 and was expected to be fully commissioned by Q1 2011. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |