Indian Energy Theni Project Phase 1

Sector: Raw Materials • Location: India

Source: World Bank Group

Project
Active

Indian Energy Theni Project was a 49.5 MW wind farm at Theni in the State of Tamil Nadu. The Theni Project was designed and commissioned in two phases. Phase I consisted of 11 turbines of 1.5 MW capacity each and with a total generating capacity of 16.5 MW. Phase II, consisted of up to 22 turbines of 1.5 MW each and a total capacity of up to 33 MW.

Indian Energy contracted ReGen Powertech Privat

Project Information FAQ

Project Information

5 Q
The project “Indian Energy Theni Project Phase 1” is an infrastructure initiative in the Raw Materials sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Indian Energy Theni Project was a 49.5 MW wind farm at Theni in the State of Tamil Nadu. The Theni Project was designed and commissioned in two phases. Phase I consisted of 11 turbines of 1.5 MW capacity each and with a total generating capacity of 16.5 MW. Phase II, consisted of up to 22 turbines of 1.5 MW each and a total capacity of up to 33 MW. Indian Energy contracted ReGen Powertech Private Limited ("ReGen") the construction of the wind farm. ReGen was a Chennai-based company which manufactures turbines using technology from Vensys Energy AG, Germany. Indian Energy entered into a long term 20 year Power Purchase Agreement ("PPA") with the Tamil Nadu Electricity Board for the sale of power at a rate of Rs. 3.39 per kWh as governed by the current State Tariff Order for the first 4.5 MW. The first 4.5 MW of the Theni Project was approved under the Generation Based Incentive Scheme that was announced in December 2009 and was to receive a further INR 0.5 per kWh in revenue. The PPA for the next 12 MW was expected to be signed in 2010. In addition, Indian Energy planned to establish the project as a Clean Development Mechanism under the Kyoto Protocol, which is expected to generate approximately 120,000 Certified Emission Reductions ("CERs") per annum. The project cost of the phase I was estimated to be US$19.8 million, assuming a debt/equity ratio of 75/25. Phase I reached financial closure in April 2010 with (US$14.9 million) INR680 million debt facility from State Bank of India. The first phase was operation by June August 2010. The second phase had a construction scheduled to commence in Q4 2010 and was expected to be fully commissioned by Q1 2011.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data