Indian Energy Theni Project Phase 1

Sector: Raw Materials • Location: India

Source: World Bank Group

Project
Active

Indian Energy Theni Project was a 49.5 MW wind farm at Theni in the State of Tamil Nadu. The Theni Project was designed and commissioned in two phases. Phase I consisted of 11 turbines of 1.5 MW capacity each and with a total generating capacity of 16.5 MW. Phase II, consisted of up to 22 turbines of 1.5 MW each and a total capacity of up to 33 MW.

Indian Energy contracted ReGen Powertech Privat

Status
Prospective
Sector
Raw Materials, Wind, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial
Location
India
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Indian Energy Theni Project Phase 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Indian Energy Theni Project Phase 1” is an infrastructure initiative in the Raw Materials sector, located in India. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Indian Energy Theni Project was a 49.5 MW wind farm at Theni in the State of Tamil Nadu. The Theni Project was designed and commissioned in two phases. Phase I consisted of 11 turbines of 1.5 MW capacity each and with a total generating capacity of 16.5 MW. Phase II, consisted of up to 22 turbines of 1.5 MW each and a total capacity of up to 33 MW. Indian Energy contracted ReGen Powertech Private Limited ("ReGen") the construction of the wind farm. ReGen was a Chennai-based company which manufactures turbines using technology from Vensys Energy AG, Germany. Indian Energy entered into a long term 20 year Power Purchase Agreement ("PPA") with the Tamil Nadu Electricity Board for the sale of power at a rate of Rs. 3.39 per kWh as governed by the current State Tariff Order for the first 4.5 MW. The first 4.5 MW of the Theni Project was approved under the Generation Based Incentive Scheme that was announced in December 2009 and was to receive a further INR 0.5 per kWh in revenue. The PPA for the next 12 MW was expected to be signed in 2010. In addition, Indian Energy planned to establish the project as a Clean Development Mechanism under the Kyoto Protocol, which is expected to generate approximately 120,000 Certified Emission Reductions ("CERs") per annum. The project cost of the phase I was estimated to be US$19.8 million, assuming a debt/equity ratio of 75/25. Phase I reached financial closure in April 2010 with (US$14.9 million) INR680 million debt facility from State Bank of India. The first phase was operation by June August 2010. The second phase had a construction scheduled to commence in Q4 2010 and was expected to be fully commissioned by Q1 2011.

Original sector

Energy

Budget

Location

Country

India

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Raw Materials, Wind, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial

Article published date

2024-09-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project