Indiana State Fairgrounds – Guest Experience Phase 1
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Work includes a new gate entrance to the fairgrounds and improvements to the main gate and roads. Improvements include, but not limited to sitework and utilities, asphalt, fencing, landscaping, irrigation, concrete, masonry, steel, framing, metal panels, painting, and electrical. The Project consists of a New Gate 9 to enter the fairgrounds off of Fall Creek. Additionally, there are improvements t
- Status
- Closed
- Sector
- Power Transmission, Metal, Cement, Road, Steel, Water Supply and Storage, Residential, Power Generation (CCGT), Manufacturing (Industrial), Commercial
- Location
- Indianapolis, Indiana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Indiana State Fairgrounds – Guest Experience Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work includes a new gate entrance to the fairgrounds and improvements to the main gate and roads. Improvements include, but not limited to sitework and utilities, asphalt, fencing, landscaping, irrigation, concrete, masonry, steel, framing, metal panels, painting, and electrical. The Project consists of a New Gate 9 to enter the fairgrounds off of Fall Creek. Additionally, there are improvements to gate 6, the main entrance for the fair. There will be all new asphalt roads, ticketing islands ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Indiana |
City | Indianapolis |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Metal, Cement, Road, Steel, Water Supply and Storage, Residential, Power Generation (CCGT), Manufacturing (Industrial), Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
