Indiana to Central Ohio Regional Transmission Line
The owner, status and timeline of this project. A free account opens every field.
Source: The Business Journals
AEP Ohio has stated that the ability to serve over 13,000 megawatts of new data center demand, mostly in Central Ohio, depends on a proposed regional transmission project from Indiana to Central Ohio. This transmission line is not expected to be in service until 2031, and its approval by the regional grid operator PJM Interconnection is still pending. Delays or changes in this project could materi
- Status
- Prospective
- Sector
- Power Generation (CCGT), Data Center
- Location
- Columbus, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- The Business Journals
ConstructChat
Ask ConstructChat about Indiana to Central Ohio Regional Transmission Line
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | AEP Ohio has stated that the ability to serve over 13,000 megawatts of new data center demand, mostly in Central Ohio, depends on a proposed regional transmission project from Indiana to Central Ohio. This transmission line is not expected to be in service until 2031, and its approval by the regional grid operator PJM Interconnection is still pending. Delays or changes in this project could materially affect the in-service dates and the ability to supply electricity to new data centers. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Ohio |
City | Columbus |
Source
Source | The Business Journals |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Data Center |
Article published date | 2025-12-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States
- EPC of Turbine and Foundation Structure in the Southwest Sea Wind Power Demonstration Complex
- Engineering, Procurement, and Construction of Third Bosphorus Bridge
- Tampa Bay Seawater Desalination Plant
- Carlsbad Desalination Project, San Diego, California
- Joint Base Lewis-McChord
- Fort Benning, Georgia
- Naval Base San Diego, California
- Dover Air Force Base
