logo

India's First Indigenous 50-kW Geothermal Power Plant in Arunachal Pradesh

Planned · Arunachal Pradesh · Last reported Jul 2025

Source: NORTHEAST NOW

Project
Planned

India's first fully indigenous geothermal power plant with a capacity of 50 kilowatts will be established in Arunachal Pradesh. The plant is designed to operate at a low temperature of 68 degrees Celsius and will be developed jointly by the Centre for Earth Sciences and Himalayan Studies (CESHS) and the Shriram Institute for Industrial Research (SIIR). The project will be set up in Tawang district

Status
Prospective
Sector
Manufacturing (Industrial), Power Generation (CCGT), Geothermal, Government
Location
Tawang, Arunachal Pradesh, India
Updated
22 Jul 2026
Source
NORTHEAST NOW

ConstructChat

Ask ConstructChat about India's First Indigenous 50-kW Geothermal Power Plant in Arunachal Pradesh

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “India's First Indigenous 50-kW Geothermal Power Plant in Arunachal Pradesh” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Tawang, Arunachal Pradesh, India. Taiyo aggregates data on it from NORTHEAST NOW.

Participants

Sponsoring Agency

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

India's first fully indigenous geothermal power plant with a capacity of 50 kilowatts will be established in Arunachal Pradesh. The plant is designed to operate at a low temperature of 68 degrees Celsius and will be developed jointly by the Centre for Earth Sciences and Himalayan Studies (CESHS) and the Shriram Institute for Industrial Research (SIIR). The project will be set up in Tawang district, with Mago, Thingbu, and Damteng identified as potential sites. Structural mapping and preliminary research have been completed. The project is expected to be completed in three years and will serve a population of over 5,000. The estimated cost is over Rs 10 crore, funded by the Ministry of New and Renewable Energy (MNRE).

Original sector

Energy

Budget

Location

Country

India

State

Arunachal Pradesh

City

Tawang

Source

Source

NORTHEAST NOW

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Power Generation (CCGT), Geothermal, Government

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project