logo

India's Power Sector Investment Needs

Sector: Power Generation (CCGT) • Location: India

Source: Evrim Ağacı

Project
Planned

India's power sector is facing significant investment needs to meet the growing energy demand driven by economic growth and renewable energy goals. Moody's projects that India will need to add 450 GW of renewable capacity and increase coal-based power generation capacity by about 35% by FY2034-35 to accommodate the doubling of power demand.

Status
Prospective
Sector
Power Generation (CCGT)
Location
India
Updated
22 Jul 2026
Source
Evrim Ağacı

ConstructChat

Ask ConstructChat about India's Power Sector Investment Needs

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “India's Power Sector Investment Needs” is an infrastructure initiative in the Power Generation (CCGT) sector, located in India. Taiyo aggregates data on it from Evrim Ağacı.

Participants

Not available for this record.

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

India's power sector is facing significant investment needs to meet the growing energy demand driven by economic growth and renewable energy goals. Moody's projects that India will need to add 450 GW of renewable capacity and increase coal-based power generation capacity by about 35% by FY2034-35 to accommodate the doubling of power demand.

Original sector

Energy

Location

Country

India

Source

Source

Evrim Ağacı

URL

More Details

Record type

Project

Sector

Power Generation (CCGT)

Article published date

2025-02-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project