logo

Indonesia eMobility Regulations

Sector: Manufacturing (Industrial) • Location: Indonesia

Source: International Finance Corporation (IFC)

Project
Active

Pre-implementation diagnostics have yielded a long list of regulatory and incentive gaps. From this list, the team has developed a short list of regulations and incentives that will be required to stimulate greater e2W adoption, their charging and their manufacture. This project will convert this shortlist of regulations and incentives into a prioritized and phased Reform Action Plan that lays out

Project Information FAQ

Project Information

4 Q
The project “Indonesia eMobility Regulations” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Indonesia. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Pre-implementation diagnostics have yielded a long list of regulatory and incentive gaps. From this list, the team has developed a short list of regulations and incentives that will be required to stimulate greater e2W adoption, their charging and their manufacture. This project will convert this shortlist of regulations and incentives into a prioritized and phased Reform Action Plan that lays out the sequence of introduction and implementation of regulations, informed by global best practice and the needs of investors. The project will also support Government and private sector institutions that may be established to monitor and coordinate implementation of the Reform Action Plan. Finally, the project will support the Government in designing and implementing new regulations and incentives by leveraging IFC’s global knowledge and networks to introduce regulations based in global best practice. PHASE1: PREPARATION The implementation activities of this project will begin with a Preparation Phase that will result in a prioritized and sequenced Reform Action Plan. During the preparation phase, the team will also work to develop theories of change for each regulatory area that will be tackled. These will be used to define the results framework and the project will be restructured to incorporate this framework. The project team will work to support the establishment and operation of institutional structures that can support the coordination and monitoring of the implementation of the reform action plan. REGULATORY IMPLEMENTATION PHASE 1 During this phase, the team will support the introduction and implementation of high priority regulations agreed in the first phase of the Action Plan.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data