Indonesia Geothermal Resource Risk Mitigation Project (GREM)
Sector: Power Generation (CCGT) • Location: Indonesia
Source: World Bank
The objectives of the Geothermal Resource Risk Mitigation Project of Indonesia are to scale up investment in geothermal energy development and support the Borrower in its efforts to reduce greenhouse gas emissions in the country. The project has two components. Component 1 is to mitigate risks in geothermal resource drilling supported through the establishment of a new financing facility is financ
- Status
- Prospective
- Sector
- Power Generation (CCGT), Geothermal, Government
- Location
- Indonesia
- Updated
- 22 Jul 2026
- Source
- World Bank
ConstructChat
Ask ConstructChat about Indonesia Geothermal Resource Risk Mitigation Project (GREM)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objectives of the Geothermal Resource Risk Mitigation Project of Indonesia are to scale up investment in geothermal energy development and support the Borrower in its efforts to reduce greenhouse gas emissions in the country. The project has two components. Component 1 is to mitigate risks in geothermal resource drilling supported through the establishment of a new financing facility is financed with 455 million US Dollars, which consists of 150 million US Dollars from IBRD loan, 97.5 million US Dollars from the GCF loan and reimbursable grant, 72.5 million US Dollars from Clean Technology Fund (CTF) loan and contingent recovery grant, 75 million US Dollars from the Clean Technology Fund (CTF) loan and contingent recovery grant, 75 million US Dollars from Gol’s PISP loan, which will leverage 60 million US Dollars in private developers’ equity. Component 2 for technical assistance and capacity strengthening is financed with 10 million US Dollars grant, which consists of 2.5 million US Dollars from GCF, 2.5 million US Dollars from CTF, 2.5 million US Dollars from the Energy Sector Management Assistance Program (ESMAP) and 2.5 million US Dollars from the Global Infrastructure Facility (GIF). |
Original sector | FY17 - Energy and Extractives |
Budget |
Location
Country | Indonesia |
Source
Source | World Bank |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Geothermal, Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Indonesia
- Sarulla Geothermal Power Plant
- Cirebon CoalFired Power Plant Expansion West Java
- Rantau Dedap Geothermal Power Project South Sumatra
- Muara Karang Expansion Project Jakarta Indonesia
- Cirata Floating Photovoltaic Power Plant
- Tanjung Jati B Power Plant Expansion
- Tolo Wind Park
- Jatiluhur I Drinking Water Supply System
