logo
ProjectActive

Indonesia Geothermal Resource Risk Mitigation Project (GREM)

Sector: Power Generation (CCGT) • Location: Indonesia

Source: World Bank

The objectives of the Geothermal Resource Risk Mitigation Project of Indonesia are to scale up investment in geothermal energy development and support the Borrower in its efforts to reduce greenhouse gas emissions in the country. The project has two components. Component 1 is to mitigate risks in geothermal resource drilling supported through the establishment of a new financing facility is financ

Status
Prospective
Sector
Power Generation (CCGT), Geothermal, Government
Location
Indonesia
Updated
22 Jul 2026
Source
World Bank

ConstructChat

Ask ConstructChat about Indonesia Geothermal Resource Risk Mitigation Project (GREM)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Indonesia Geothermal Resource Risk Mitigation Project (GREM)” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Indonesia. Taiyo aggregates data on it from World Bank.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The objectives of the Geothermal Resource Risk Mitigation Project of Indonesia are to scale up investment in geothermal energy development and support the Borrower in its efforts to reduce greenhouse gas emissions in the country. The project has two components. Component 1 is to mitigate risks in geothermal resource drilling supported through the establishment of a new financing facility is financed with 455 million US Dollars, which consists of 150 million US Dollars from IBRD loan, 97.5 million US Dollars from the GCF loan and reimbursable grant, 72.5 million US Dollars from Clean Technology Fund (CTF) loan and contingent recovery grant, 75 million US Dollars from the Clean Technology Fund (CTF) loan and contingent recovery grant, 75 million US Dollars from Gol’s PISP loan, which will leverage 60 million US Dollars in private developers’ equity. Component 2 for technical assistance and capacity strengthening is financed with 10 million US Dollars grant, which consists of 2.5 million US Dollars from GCF, 2.5 million US Dollars from CTF, 2.5 million US Dollars from the Energy Sector Management Assistance Program (ESMAP) and 2.5 million US Dollars from the Global Infrastructure Facility (GIF).

Original sector

FY17 - Energy and Extractives

Budget

Location

Country

Indonesia

Source

Source

World Bank

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Geothermal, Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project