logo
ProjectProposed

Indonesia: Strengthening Sumatra Power Distribution Results-Based Project

One of 10,000+ projects Taiyo tracks in Indonesia.

Source: Asian Infrastructure Investment Bank (AIIB)

The proposed RBP will focus on three main results areas: 1) to increase access to sustainable and climate resilient electricity, 2) to improve the reliability of electricity supply and services by strengthening the distribution network, and 3) to improve the efficiency of the distribution system by reducing losses. Together with Perusahaan Listrik Negara (PLN) and other financiers, the proposed RB

Status
Prospective
Sector
Water Supply and Storage, Solar, Consumer Products, Rail, Oil and Gas, Energy Storage, Electric Vehicles (EVs), Automotive, Power Generation (CCGT), Commercial, Residential, Education, Government
Location
Indonesia
Updated
22 Jul 2026
Source
Asian Infrastructure Investment Bank (AIIB)

ConstructChat

Ask ConstructChat about Indonesia: Strengthening Sumatra Power Distribution Results-Based Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Indonesia: Strengthening Sumatra Power Distribution Results-Based Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Indonesia. Taiyo aggregates data on it from Asian Infrastructure Investment Bank (AIIB).

Participants

Sponsoring Agency

Status

Original status

proposed

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed RBP will focus on three main results areas: 1) to increase access to sustainable and climate resilient electricity, 2) to improve the reliability of electricity supply and services by strengthening the distribution network, and 3) to improve the efficiency of the distribution system by reducing losses. Together with Perusahaan Listrik Negara (PLN) and other financiers, the proposed RBP would contribute to financing the distribution component under PLN's rolling 10-year General Plan for Electricity Supply (RUPTL) within the Sumatra region for the period 2024-2028. The RBP will exclude any activities with significant adverse environmental and social (ES) risks and impacts or high-value contracts above a specified threshold. The RBP will finance activities across four primary areas—Sales, Reliability, Efficiency, and Rural Electrification—through targeted infrastructure improvements. Key initiatives include the expansion of distribution lines, construction of EV charging stations, installation of new SCADA key points for better grid management, and the rollout of smart meters to enhance operational efficiency and monitoring. Disbursements under the program will be contingent on achieving Disbursement-Linked Results (DLRs), which will be verified by an Independent Verification Agent (IVA). Funds will be released upon approved verification and submission of withdrawal applications, ensuring accountability and alignment with project objectives.

Original sector

Energy

Budget

Location

Country

Indonesia

Source

Source

Asian Infrastructure Investment Bank (AIIB)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Solar, Consumer Products, Rail, Oil and Gas, Energy Storage, Electric Vehicles (EVs), Automotive, Power Generation (CCGT), Commercial, Residential, Education, Government

Article published date

2025-09-13

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project