Indonesia: Strengthening Sumatra Power Distribution Results-Based Project
The status, timeline and source of this project. A free account opens every field.
Source: Asian Infrastructure Investment Bank (AIIB)
The proposed RBP will focus on three main results areas: 1) to increase access to sustainable and climate resilient electricity, 2) to improve the reliability of electricity supply and services by strengthening the distribution network, and 3) to improve the efficiency of the distribution system by reducing losses. Together with Perusahaan Listrik Negara (PLN) and other financiers, the proposed RB
- Status
- Prospective
- Sector
- Water Supply and Storage, Energy Storage, Power Generation (CCGT), Electric Vehicles (EVs), Solar, Consumer Products, Oil and Gas, Rail, Automotive, Education, Residential, Commercial, Government
- Location
- Indonesia
- Updated
- 22 Jul 2026
- Source
- Asian Infrastructure Investment Bank (AIIB)
ConstructChat
Ask ConstructChat about Indonesia: Strengthening Sumatra Power Distribution Results-Based Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | proposed |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed RBP will focus on three main results areas: 1) to increase access to sustainable and climate resilient electricity, 2) to improve the reliability of electricity supply and services by strengthening the distribution network, and 3) to improve the efficiency of the distribution system by reducing losses. Together with Perusahaan Listrik Negara (PLN) and other financiers, the proposed RBP would contribute to financing the distribution component under PLN's rolling 10-year General Plan for Electricity Supply (RUPTL) within the Sumatra region for the period 2024-2028. The RBP will exclude any activities with significant adverse environmental and social (ES) risks and impacts or high-value contracts above a specified threshold. The RBP will finance activities across four primary areas—Sales, Reliability, Efficiency, and Rural Electrification—through targeted infrastructure improvements. Key initiatives include the expansion of distribution lines, construction of EV charging stations, installation of new SCADA key points for better grid management, and the rollout of smart meters to enhance operational efficiency and monitoring. Disbursements under the program will be contingent on achieving Disbursement-Linked Results (DLRs), which will be verified by an Independent Verification Agent (IVA). Funds will be released upon approved verification and submission of withdrawal applications, ensuring accountability and alignment with project objectives. |
Original sector | Energy |
Budget |
Location
Country | Indonesia |
Source
Source | Asian Infrastructure Investment Bank (AIIB) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Energy Storage, Power Generation (CCGT), Electric Vehicles (EVs), Solar, Consumer Products, Oil and Gas, Rail, Automotive, Education, Residential, Commercial, Government |
Article published date | 2025-12-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Indonesia
- Cirebon CoalFired Power Plant Expansion West Java
- Rantau Dedap Geothermal Power Project South Sumatra
- Cirata Floating Photovoltaic Power Plant
- Jatiluhur I Drinking Water Supply System
- Palapa Ring Central Broadband
- Tangguh LNG Expansion Project, Papua Barat Province
- Melaka PSR-2 Refinery
- Petronas RAPID Project, Southern Johor
