Indonesia: Strengthening Sumatra Power Distribution Results-Based Project
Sector: Water Supply and Storage • Location: Indonesia
Source: Asian Infrastructure Investment Bank (AIIB)
The proposed RBP will focus on three main results areas: 1) to increase access to sustainable and climate resilient electricity, 2) to improve the reliability of electricity supply and services by strengthening the distribution network, and 3) to improve the efficiency of the distribution system by reducing losses. Together with Perusahaan Listrik Negara (PLN) and other financiers, the proposed RB
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | proposed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The proposed RBP will focus on three main results areas: 1) to increase access to sustainable and climate resilient electricity, 2) to improve the reliability of electricity supply and services by strengthening the distribution network, and 3) to improve the efficiency of the distribution system by reducing losses. Together with Perusahaan Listrik Negara (PLN) and other financiers, the proposed RBP would contribute to financing the distribution component under PLN's rolling 10-year General Plan for Electricity Supply (RUPTL) within the Sumatra region for the period 2024-2028. The RBP will exclude any activities with significant adverse environmental and social (ES) risks and impacts or high-value contracts above a specified threshold. The RBP will finance activities across four primary areas—Sales, Reliability, Efficiency, and Rural Electrification—through targeted infrastructure improvements. Key initiatives include the expansion of distribution lines, construction of EV charging stations, installation of new SCADA key points for better grid management, and the rollout of smart meters to enhance operational efficiency and monitoring. Disbursements under the program will be contingent on achieving Disbursement-Linked Results (DLRs), which will be verified by an Independent Verification Agent (IVA). Funds will be released upon approved verification and submission of withdrawal applications, ensuring accountability and alignment with project objectives. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
