Indonesia: Strengthening Sumatra Power Distribution Results-Based Project
One of 10,000+ projects Taiyo tracks in Indonesia.
Source: Asian Infrastructure Investment Bank (AIIB)
The proposed Results-Based Project (RBP) will support PT Perusahaan Listrik Negara (PLN) to finance the distribution component of the 10-year General Plan for Electricity Supply (RUPTL) within the Sumatra region for the period 2024-2028. The RBP will focus on three main results areas: (i) to increase access to sustainable and climate resilient electricity; (ii) to improve the reliability of electr
- Status
- Prospective
- Sector
- Power Generation (CCGT), Road, Government, Consumer Products, Water Supply and Storage, Solar, Energy Storage, Oil and Gas, Commercial, Residential
- Location
- Indonesia
- Updated
- 22 Jul 2026
- Source
- Asian Infrastructure Investment Bank (AIIB)
ConstructChat
Ask ConstructChat about Indonesia: Strengthening Sumatra Power Distribution Results-Based Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | proposed |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed Results-Based Project (RBP) will support PT Perusahaan Listrik Negara (PLN) to finance the distribution component of the 10-year General Plan for Electricity Supply (RUPTL) within the Sumatra region for the period 2024-2028. The RBP will focus on three main results areas: (i) to increase access to sustainable and climate resilient electricity; (ii) to improve the reliability of electricity supply and services by strengthening the distribution network; and (iii) to improve the efficiency of the distribution system by reducing losses. The RBP will exclude any activities with significant adverse environmental and social (ES) risks and impacts or high-value contracts above a specified threshold. The exclusion criteria will be developed when undertaking the RBP assessments on technical, ES, and fiduciary system of PLN during the preparation. |
Original sector | Energy |
Budget |
Location
Country | Indonesia |
Source
Source | Asian Infrastructure Investment Bank (AIIB) |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Road, Government, Consumer Products, Water Supply and Storage, Solar, Energy Storage, Oil and Gas, Commercial, Residential |
Article published date | 2024-08-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Indonesia
- Sarulla Geothermal Power Plant
- Cirebon CoalFired Power Plant Expansion West Java
- Rantau Dedap Geothermal Power Project South Sumatra
- Muara Karang Expansion Project Jakarta Indonesia
- Cirata Floating Photovoltaic Power Plant
- Tanjung Jati B Power Plant Expansion
- Tolo Wind Park
- Jatiluhur I Drinking Water Supply System
