logo

Indonesia: Strengthening Sumatra Power Distribution Results-Based Project

Sector: Water Supply and Storage • Location: Indonesia

Source: Asian Infrastructure Investment Bank (AIIB)

Project
Proposed

The proposed RBP will focus on three main results areas: 1) to increase access to sustainable and climate resilient electricity, 2) to improve the reliability of electricity supply and services by strengthening the distribution network, and 3) to improve the efficiency of the distribution system by reducing losses. Together with Perusahaan Listrik Negara (PLN) and other financiers, the proposed RB

Project Information FAQ

Project Information

5 Q
The project “Indonesia: Strengthening Sumatra Power Distribution Results-Based Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Indonesia. Taiyo aggregates data on it from Asian Infrastructure Investment Bank (AIIB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

proposed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed RBP will focus on three main results areas: 1) to increase access to sustainable and climate resilient electricity, 2) to improve the reliability of electricity supply and services by strengthening the distribution network, and 3) to improve the efficiency of the distribution system by reducing losses. Together with Perusahaan Listrik Negara (PLN) and other financiers, the proposed RBP would contribute to financing the distribution component under PLN's rolling 10-year General Plan for Electricity Supply (RUPTL) within the Sumatra region for the period 2024-2028. The RBP will exclude any activities with significant adverse environmental and social (ES) risks and impacts or high-value contracts above a specified threshold. The RBP will finance activities across four primary areas—Sales, Reliability, Efficiency, and Rural Electrification—through targeted infrastructure improvements. Key initiatives include the expansion of distribution lines, construction of EV charging stations, installation of new SCADA key points for better grid management, and the rollout of smart meters to enhance operational efficiency and monitoring. Disbursements under the program will be contingent on achieving Disbursement-Linked Results (DLRs), which will be verified by an Independent Verification Agent (IVA). Funds will be released upon approved verification and submission of withdrawal applications, ensuring accountability and alignment with project objectives.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data