logo

Indonesia: Strengthening Sumatra Power Distribution Results-Based Project

Sector: Solar • Location: Indonesia

Source: Asian Infrastructure Investment Bank (AIIB)

Project
Proposed

The proposed Results-Based Project (RBP) will support PT Perusahaan Listrik Negara (PLN) to finance the distribution component of the 10-year General Plan for Electricity Supply (RUPTL) within the Sumatra region for the period 2024-2028. The RBP will focus on three main results areas: (i) to increase access to sustainable and climate resilient electricity; (ii) to improve the reliability of electr

Project Information FAQ

Project Information

5 Q
The project “Indonesia: Strengthening Sumatra Power Distribution Results-Based Project” is an infrastructure initiative in the Solar sector, located in Indonesia. Taiyo aggregates data on it from Asian Infrastructure Investment Bank (AIIB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

proposed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed Results-Based Project (RBP) will support PT Perusahaan Listrik Negara (PLN) to finance the distribution component of the 10-year General Plan for Electricity Supply (RUPTL) within the Sumatra region for the period 2024-2028. The RBP will focus on three main results areas: (i) to increase access to sustainable and climate resilient electricity; (ii) to improve the reliability of electricity supply and services by strengthening the distribution network; and (iii) to improve the efficiency of the distribution system by reducing losses. The RBP will exclude any activities with significant adverse environmental and social (ES) risks and impacts or high-value contracts above a specified threshold. The exclusion criteria will be developed when undertaking the RBP assessments on technical, ES, and fiduciary system of PLN during the preparation.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data