logo

Indonesia Sustainable Least-cost Electrification-2 (ISLE-2) Operation

Sector: Solar • Location: Indonesia

Source: World Bank Group

Project
Active

The ISLE-2 Operation encompasses a Program for Results component (the ISLE-2 Program, PforR) and an Investment Project Financing (IPF) Technical Assistance (TA) component (the ISLE-2 Project). The ISLE-2 Project, financed by a US$10 million GCF grant and US$3 million ESMAP grant, will include: (i) Generation Plans with VRE Integration and Capacity Building (technical): supporting the purchase of s

Status
Prospective
Sector
Solar, Power Generation (CCGT), Wind, Commercial, Government
Location
Indonesia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Indonesia Sustainable Least-cost Electrification-2 (ISLE-2) Operation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Indonesia Sustainable Least-cost Electrification-2 (ISLE-2) Operation” is an infrastructure initiative in the Solar sector, located in Indonesia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The ISLE-2 Operation encompasses a Program for Results component (the ISLE-2 Program, PforR) and an Investment Project Financing (IPF) Technical Assistance (TA) component (the ISLE-2 Project). The ISLE-2 Project, financed by a US$10 million GCF grant and US$3 million ESMAP grant, will include: (i) Generation Plans with VRE Integration and Capacity Building (technical): supporting the purchase of software licenses for an energy generation planning tool (such as PLEXOS), their implementation and ongoing training on their usage (US$2.5 million); (ii) Transaction Advisory and Capacity Building (Procurement and Legal): providing transaction advisory support for the selection of independent power producers and hiring evaluation and monitoring consultants, including IVAs, to support IBRD/IDA financed operations, including the ISLE-1, ISLE-2 and I-ENET PforRs (US$2.5 million); (iii) RE Infrastructure and Resilience/Adaptation Studies: strengthening PLN’s E&S and gender management capacities, including through (a) consultants, training, and capacity building activities to support the implementation of PLN’s ESMS and strengthen PLN’s capacities to plan and design gender-sensitive energy policies, and (b) preparing technical assessments and E&S assessments and instruments necessary for the development and investments in transmission lines needed for RE deployment (Identified Investments) to be selected and agreed upon by PLN and the World Bank in accordance with the selection criteria and procedures set forth in the Project Operations Manual (US$8 million).

Original sector

Energy and Mineral Resources

Location

Country

Indonesia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Solar, Power Generation (CCGT), Wind, Commercial, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project