Indonesia Sustainable Least-cost Electrification-2 (ISLE-2) Operation
Sector: Solar • Location: Indonesia
Source: World Bank Group
The ISLE-2 Operation encompasses a Program for Results component (the ISLE-2 Program, PforR) and an Investment Project Financing (IPF) Technical Assistance (TA) component (the ISLE-2 Project). The ISLE-2 Project, financed by a US$10 million GCF grant and US$3 million ESMAP grant, will include: (i) Generation Plans with VRE Integration and Capacity Building (technical): supporting the purchase of s
- Status
- Prospective
- Sector
- Solar, Power Generation (CCGT), Wind, Commercial, Government
- Location
- Indonesia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Indonesia Sustainable Least-cost Electrification-2 (ISLE-2) Operation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The ISLE-2 Operation encompasses a Program for Results component (the ISLE-2 Program, PforR) and an Investment Project Financing (IPF) Technical Assistance (TA) component (the ISLE-2 Project). The ISLE-2 Project, financed by a US$10 million GCF grant and US$3 million ESMAP grant, will include: (i) Generation Plans with VRE Integration and Capacity Building (technical): supporting the purchase of software licenses for an energy generation planning tool (such as PLEXOS), their implementation and ongoing training on their usage (US$2.5 million); (ii) Transaction Advisory and Capacity Building (Procurement and Legal): providing transaction advisory support for the selection of independent power producers and hiring evaluation and monitoring consultants, including IVAs, to support IBRD/IDA financed operations, including the ISLE-1, ISLE-2 and I-ENET PforRs (US$2.5 million); (iii) RE Infrastructure and Resilience/Adaptation Studies: strengthening PLN’s E&S and gender management capacities, including through (a) consultants, training, and capacity building activities to support the implementation of PLN’s ESMS and strengthen PLN’s capacities to plan and design gender-sensitive energy policies, and (b) preparing technical assessments and E&S assessments and instruments necessary for the development and investments in transmission lines needed for RE deployment (Identified Investments) to be selected and agreed upon by PLN and the World Bank in accordance with the selection criteria and procedures set forth in the Project Operations Manual (US$8 million). |
Original sector | Energy and Mineral Resources |
Location
Country | Indonesia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Solar, Power Generation (CCGT), Wind, Commercial, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
