Indonesia's First Ocean Current Power Plant
Sector: Power Generation (CCGT) • Location: Indonesia
Source: The Jakarta Post
The project involves the construction of Indonesia's first ocean current power plant with a total capacity of 40 megawatts (MW). It will be developed in two phases: 20 MW in East Nusa Tenggara and 20 MW in West Nusa Tenggara. The project aims to support the national energy transition, strengthen energy security, and promote sustainable use of marine resources.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Government
- Location
- Indonesia
- Updated
- 22 Jul 2026
- Source
- The Jakarta Post
ConstructChat
Ask ConstructChat about Indonesia's First Ocean Current Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the construction of Indonesia's first ocean current power plant with a total capacity of 40 megawatts (MW). It will be developed in two phases: 20 MW in East Nusa Tenggara and 20 MW in West Nusa Tenggara. The project aims to support the national energy transition, strengthen energy security, and promote sustainable use of marine resources. |
Original sector | Energy |
Budget |
Location
Country | Indonesia |
Source
Source | The Jakarta Post |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government |
Article published date | 2025-06-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
