logo
ProjectDesign Development

IN/DOT: I 65 Interchange Modification

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

I65 & Lafayette Ave SB Exit Ramp 1.25 mi N of SR32 Interchange. And Bridges, I65 & Lafayette INTC, I65NB over Prairie Crk Trail; 0.55 mi N of SR32 and US52 over I65 SB/NB; 1.89 mi N of SR 32.

Status
Prospective
Sector
Bridge, Commercial, Manufacturing (Industrial)
Location
Crawfordsville, Indiana, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about IN/DOT: I 65 Interchange Modification

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “IN/DOT: I 65 Interchange Modification” is an infrastructure initiative in the Bridge sector, located in Crawfordsville, Indiana, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Design Development

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

I65 & Lafayette Ave SB Exit Ramp 1.25 mi N of SR32 Interchange. And Bridges, I65 & Lafayette INTC, I65NB over Prairie Crk Trail; 0.55 mi N of SR32 and US52 over I65 SB/NB; 1.89 mi N of SR 32.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Indiana

City

Crawfordsville

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Bridge, Commercial, Manufacturing (Industrial)

Article published date

2024-06-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project