IN/DOT: SR 252 Pavement Replacement
Sector: Steel • Location: Franklin, Indiana, United States of America
Source: Dodge USA
PAVEMENT REPLACEMENT JOHNSON COUNTY - ON SR 252 FROM US 31 TO 0.18 MILE WEST OF I-65 (RP 028+0001 TO 030+0022) SCOUR PROTECTION 252-41-06404 CONTINUOUS STEEL BEAM JOHNSON COUNTY - ON SR 252 OVER BIG BLUE RIVER, 0.52 MILE EAST OF US 31 (RP 028+0037) SMALL STRUCTURE REPLACEMENT CV 252-041-29.94 CULVERT JOHNSON COUNTY - ON SR 252, 2.20 MILES EAST OF US 31 (RP 029+0080) BIKE AND PEDESTRIAN FACILITIES
- Status
- Prospective
- Sector
- Steel, Bridge, Road, Car parking, Automotive, Metal, Commercial
- Location
- Franklin, Indiana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about IN/DOT: SR 252 Pavement Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | PAVEMENT REPLACEMENT JOHNSON COUNTY - ON SR 252 FROM US 31 TO 0.18 MILE WEST OF I-65 (RP 028+0001 TO 030+0022) SCOUR PROTECTION 252-41-06404 CONTINUOUS STEEL BEAM JOHNSON COUNTY - ON SR 252 OVER BIG BLUE RIVER, 0.52 MILE EAST OF US 31 (RP 028+0037) SMALL STRUCTURE REPLACEMENT CV 252-041-29.94 CULVERT JOHNSON COUNTY - ON SR 252, 2.20 MILES EAST OF US 31 (RP 029+0080) BIKE AND PEDESTRIAN FACILITIES JOHNSON COUNTY - ALONG SR 252 FROM LINCOLN STREET TO CR 800E ADA SIDEWALK RAMP CONSTRUCTION JOHNS... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Indiana |
City | Franklin |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Steel, Bridge, Road, Car parking, Automotive, Metal, Commercial |
Article published date | 2024-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- Pacific Visions Wing at the Aquarium of the Pacific
- WilmerHale Tenant Fit-Out
- UW Seismic Improvements
- DCA Terminal A Improvements
- Kansas City International Airport (MCI) New Single Terminal
