logo

IN/DOT: US 20 Two Bridge Deck Overlays

Sector: Road • Location: South Bend, Indiana, United States of America

Source: Dodge

Project
Closed

Bridge Rehabilitation Services Project development for two Bridge Deck Overlays on US 20 in St Joseph County. Design and plan development work necessary to produce the construction contract documents. The selected firm will be required to provide a Topographic Survey, Pavement Design, Environmental Documentation, all Permit Applications, Utility Coordination, Bridge Design Plans, Traffic Managemen

Status
Closed
Sector
Road, Bridge, Power Transmission, Power Generation (CCGT), Commercial
Location
South Bend, Indiana, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about IN/DOT: US 20 Two Bridge Deck Overlays

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “IN/DOT: US 20 Two Bridge Deck Overlays” is an infrastructure initiative in the Road sector, located in South Bend, Indiana, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Bridge Rehabilitation Services Project development for two Bridge Deck Overlays on US 20 in St Joseph County. Design and plan development work necessary to produce the construction contract documents. The selected firm will be required to provide a Topographic Survey, Pavement Design, Environmental Documentation, all Permit Applications, Utility Coordination, Bridge Design Plans, Traffic Management Plans and Construction Phase Services. Tree clearing is also anticipated Bridge Rehabilitation ...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Indiana

City

South Bend

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Road, Bridge, Power Transmission, Power Generation (CCGT), Commercial

Article published date

2025-07-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project