Indrayani River Footbridge Reconstruction
Sector: Metal • Location: Pune, Maharashtra, India
Source: Times of India
A structurally weak iron-and-concrete footbridge over the Indrayani river near Pune collapsed, resulting in fatalities and injuries. The existing footbridge was declared unfit but not officially closed. The Maharashtra government sanctioned Rs 8 crore for constructing a new bridge parallel to the existing one, with work scheduled to begin after the monsoon.
- Status
- Prospective
- Sector
- Metal, Government, Cement, Bridge, Steel
- Location
- Pune, Maharashtra, India
- Updated
- 22 Jul 2026
- Source
- Times of India
ConstructChat
Ask ConstructChat about Indrayani River Footbridge Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A structurally weak iron-and-concrete footbridge over the Indrayani river near Pune collapsed, resulting in fatalities and injuries. The existing footbridge was declared unfit but not officially closed. The Maharashtra government sanctioned Rs 8 crore for constructing a new bridge parallel to the existing one, with work scheduled to begin after the monsoon. |
Original sector | Infrastructure |
Budget |
Location
Country | India |
State | Maharashtra |
City | Pune |
Source
Source | Times of India |
URL |
More Details
Record type | Project |
Sector | Metal, Government, Cement, Bridge, Steel |
Article published date | 2025-06-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
