Industrial Control System and IT Data Center Relocation
Pre-design · California · Last reported Aug 2024
Source: Dodge USA
The Orange County Sanitation District may be seeking a consultant to provide design services for the Industrial Control System and IT Data Center relocation project at Plant No. 1. Project will include adequate ventilation and air conditioning to meet the needs of the new server room. This project will relocate and reconfigure networking, fiber optics, and IT equipment from Control Center and Powe
- Status
- Prospective
- Sector
- Telecommunications, Consumer Products, Commercial, Data Center, Broadband, Government, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Fountain Valley, California, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Industrial Control System and IT Data Center Relocation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The Orange County Sanitation District may be seeking a consultant to provide design services for the Industrial Control System and IT Data Center relocation project at Plant No. 1. Project will include adequate ventilation and air conditioning to meet the needs of the new server room. This project will relocate and reconfigure networking, fiber optics, and IT equipment from Control Center and Power Building 3A to the new server room constructed by P1-105 Headworks Project. Also this project w... |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Fountain Valley |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Telecommunications, Consumer Products, Commercial, Data Center, Broadband, Government, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2024-09-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Telecommunications projects in United States of America
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- INSTALL 1 FLAGPOLE,6 ANTENNAS,1 RADOME,3 POWER CABLES,3 HYBR D CABLES,JUMPERS FROM RRUS TO ANTENNAS,NEW 10'X10'LEASE..SEE
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- COLLOCATION OF (3)NEW ANTENNAS & ASSOCIATED CABLES & EQUIPMT PER ATTACHED SCOPE OF WORK. 6904 COMPLIANT AT&T (E)CELL SITE
