logo
ProjectDelayed

Industrial Office

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

83,045 gross sf building - (with less than 59,576 sf of industrial office, 5,000 sf of traditional office, ground floor retail and structured parking). The building has a day lit basement level and first floor of concrete, with 5 levels of Type 3-A heavy timber above. Stormwater will be collected on the roof of the building and treated in flow through stormwater planters on the third level.

Status
Failure
Sector
Commercial, Forest Products and Packaging, Cement, Manufacturing (Industrial), Residential, Car parking, Automotive, Water Supply and Storage
Location
Portland, Oregon, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Industrial Office

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Industrial Office” is an infrastructure initiative in the Commercial sector, located in Portland, Oregon, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Delayed

Taiyo status

Failure

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

83,045 gross sf building - (with less than 59,576 sf of industrial office, 5,000 sf of traditional office, ground floor retail and structured parking). The building has a day lit basement level and first floor of concrete, with 5 levels of Type 3-A heavy timber above. Stormwater will be collected on the roof of the building and treated in flow through stormwater planters on the third level.

Budget

Location

Country

United States of America (USA)

State

Oregon

City

Portland

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Forest Products and Packaging, Cement, Manufacturing (Industrial), Residential, Car parking, Automotive, Water Supply and Storage

Article published date

2024-03-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project