Industrial Park Lift Station Replacement
Sector: Water Supply and Storage • Location: Braselton, Georgia, United States of America
Source: Dodge USA
The Project consists of, but is not limited to the following major elements: Construction of a triplex submersible sewer lift station and site, 3,632 L.F. of 18-inch , 12-inch, and 8-inch dia. PVC gravity sewer line, 4,821 L.F. 16-inch dia. HDPE sewer forcemain, 510 L.F. of jack and bore, 250 L.F. of horizontal directional drilling, 23 each 5-foot and 6-foot dia. manholes, abandonment of an existi
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Manufacturing (Industrial), Commercial, Waste Processing and Treatment, Car parking, Automotive
- Location
- Braselton, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Industrial Park Lift Station Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project consists of, but is not limited to the following major elements: Construction of a triplex submersible sewer lift station and site, 3,632 L.F. of 18-inch , 12-inch, and 8-inch dia. PVC gravity sewer line, 4,821 L.F. 16-inch dia. HDPE sewer forcemain, 510 L.F. of jack and bore, 250 L.F. of horizontal directional drilling, 23 each 5-foot and 6-foot dia. manholes, abandonment of an existing lift station, and associated appurtenances. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Braselton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Manufacturing (Industrial), Commercial, Waste Processing and Treatment, Car parking, Automotive |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
