Industrial Waste Management and Cleanup Project
Sector: Water Supply and Storage • Location: Montenegro
Source: World Bank Group
The Industrial Waste Management and Cleanup Project of Montenegro has an objective designed to reduce contamination of Montenegros natural resources and public health risks of exposure to this contamination from selected industrial waste disposal sites. The project consists of three components. The first component This component will finance the detailed design, construction, and supervision for
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Industrial Waste Management and Cleanup Project of Montenegro has an objective designed to reduce contamination of Montenegros natural resources and public health risks of exposure to this contamination from selected industrial waste disposal sites. The project consists of three components. The first component This component will finance the detailed design, construction, and supervision for the remediation of the Project Sites, including through the following measures: slope and dam stabilization; coverage; containment cells; in-site encapsulation; re-shaping; re-vegetation; drainage and other water management investments including groundwater management measures, if needed; and removal (including export) of hazardous and non-hazardous waste. Component two will support the Borrower and industries involved with management of the Project Sites in managing future industrial hazardous waste generation in a manner compliant with national and EU legislation, in strengthening the Borrowers institutional and regulatory capacities in the field of industrial hazardous waste management, and in exploring options for developing infrastructure for industrial hazardous waste disposal at the national level. Finally, component three This component will support Project management and capacity building at EPA, including establishment of the PMU, and support for project monitoring and evaluation, including establishment of a monitoring and evaluation system, funding of audits, training, equipment, consultants services, and incremental operating costs. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
