logo

Industrial Waste Management and Cleanup Project

Sector: Water Supply and Storage • Location: Montenegro

Source: World Bank

Project
Closed

The Industrial Waste Management and Cleanup Project of Montenegro has an objective designed to reduce contamination of Montenegro’s natural resources and public health risks of exposure to this contamination from selected industrial waste disposal sites. The project consists of three components. The first component This component will finance the detailed design, construction, and supervision for

Status
Closed
Sector
Water Supply and Storage, Manufacturing (Industrial), Biomass, Forest Products and Packaging, Commercial, Waste Processing and Treatment, Hydro, Government
Location
Montenegro
Updated
22 Jul 2026
Source
World Bank

ConstructChat

Ask ConstructChat about Industrial Waste Management and Cleanup Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Industrial Waste Management and Cleanup Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Montenegro. Taiyo aggregates data on it from World Bank.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Industrial Waste Management and Cleanup Project of Montenegro has an objective designed to reduce contamination of Montenegro’s natural resources and public health risks of exposure to this contamination from selected industrial waste disposal sites. The project consists of three components. The first component This component will finance the detailed design, construction, and supervision for the remediation of the Project Sites, including through the following measures: slope and dam stabilization; coverage; containment cells; in-site encapsulation; re-shaping; re-vegetation; drainage and other water management investments including groundwater management measures, if needed; and removal (including export) of hazardous and non-hazardous waste. Component two will support the Borrower and industries involved with management of the Project Sites in managing future industrial hazardous waste generation in a manner compliant with national and EU legislation, in strengthening the Borrower’s institutional and regulatory capacities in the field of industrial hazardous waste management, and in exploring options for developing infrastructure for industrial hazardous waste disposal at the national level. Finally, component three This component will support Project management and capacity building at EPA, including establishment of the PMU, and support for project monitoring and evaluation, including establishment of a monitoring and evaluation system, funding of audits, training, equipment, consultants’ services, and incremental operating costs.

Original sector

FY17 - Water, Sanitation and Waste Management

Budget

Location

Country

Montenegro

Source

Source

World Bank

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Manufacturing (Industrial), Biomass, Forest Products and Packaging, Commercial, Waste Processing and Treatment, Hydro, Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project