logo

INFINITE LOOP TRAIL FM SUGARLOAF PKWY TO ST IVES COURT - LCI

Sector: Car parking • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Construction Work Program

This project begins at the intersection of Sugarloaf Parkway and Satellite Boulevard. Segment 3 features a multi-use side path running along Satellite Boulevard from Sugarloaf Parkway to the traffic signal at Sugarloaf Centre. From there a boardwalk is proposed through a portion of the Georgia Baptist Mission Board property. The trail then transitions back to a side path along Satellite Boulevard

Project Information FAQ

Project Information

4 Q
The project “INFINITE LOOP TRAIL FM SUGARLOAF PKWY TO ST IVES COURT - LCI” is an infrastructure initiative in the Car parking sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

construction work program

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project begins at the intersection of Sugarloaf Parkway and Satellite Boulevard. Segment 3 features a multi-use side path running along Satellite Boulevard from Sugarloaf Parkway to the traffic signal at Sugarloaf Centre. From there a boardwalk is proposed through a portion of the Georgia Baptist Mission Board property. The trail then transitions back to a side path along Satellite Boulevard to the intersection of Old Peachtree Road. Segment 4 features a multi-use side path running along Satellite Boulevard from Old Peachtree Road to Wildwood Road, then following along Wildwood Road into Peachtree Ridge Park. Portions of the multi-use path are already in place along Satellite Boulevard and in Peachtree Ridge Park and Segment 4 will tie into those portions. The path then continues along Suwanee Creek Road to the Segment 4 termini at the starting point of the proposed boardwalk into the wetlands and floodplain at Suwanee Creek and Bennett Creek.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data